| Tacoma Narrows Bridge Failure |
| The following items are available, all taken from a fourth-year student's report prepared in 1974: | |
| Photographs | A number of photographs showing the bridge in various states of distress. Caution: this file has 9 100x70x256 inlined GIF images at about 8 KBytes per image. Those with slow net connections might want to turn off inlined images. |
| From the report by Doug Smith: "A Case Study and Analysis of the Tacoma Narrows Bridge Failure", 99.497 Engineering Project, Department of Mechanical Engineering, Carleton University, Ottawa, Canada, March 29, 1974. Supervised by Professor G. Kardos. | |